SEG releases plans for Downtown entertainment district, Salt Palace overhaul

by | Oct 14, 2026

A rendering of the new downtown entertainment district. Image via Smith Entertainment District

The plans are finally here. 

After years of waiting, the Smith Entertainment Group has released details of its new entertainment district coupled with new renderings and information on the upcoming Salt Palace Convention Center rebuild. Overhauling the convention center and developing the entertainment district was largely made possible by the roughly $1.2 billion in taxpayer funds set aside for the project.

Ryan Smith, owner of the Utah Jazz and Utah Mammoth, released a nearly five-minute video detailing the upcoming project, which will include a new eastern facade and entrance for the Delta Center, as well as a large hotel, multiple retail locations, office space and residential elements, the video shows. 

Connecting all the new buildings is a walkway that links the Delta Center and Salt Palace, with a number of the retail locations dotting the path. A statue of a mammoth and a large Jazz logo can also be seen in the paseo renderings.

“We’re creating a walkway all the way through, and a paseo that connects the culture, convention, and sports and entertainment, all together with a central gathering place where families and people can come, experience local food, experience iconic brands, and really have a cool place to go,” Smith said in a video posted on social media. 

A rendering of the new paseo as part of the new downtown entertainment district. Image via Smith Entertainment District

Also included in the plans is a new 6,000-seat concert venue being developed in cooperation with SEG and Live Nation, which was announced by the two groups last year. In the video, Smith said the venue will have between 80 and 120 concerts a year. 

Smith added that Japantown Street, which is 100 South, has 400 feet of loading docks. Those areas will be removed and replaced with, “retail, with office, with streetscape, with murals. So that’ll be another great experience coming up 100 South.”

Included in the social media video are Salt Lake City Mayor Erin Mendenhall and Salt Lake County Mayor Jenny Wilson. 

“Prior to these district plans, when you left City Creek, you ran into the Salt Palace, and it created a wall separating our downtown,” Mendenhall said in the video. “The new district breaks down that wall and creates a walkable pedestrian connection all the way from City Creek to the Delta Center, bringing more energy and vibrancy that is desperately needed in any thriving urban core.”

Mendenhall added that Delta Center events alone generate over $970 million each year. The addition of new retail spots and the Live Nation concert venue will surely bolster those figures in the coming years. 

In the video, Wilson described the Salt Palace renovations as a “once-in-a-generation chance to reimagine” the convention center. The overhaul will allow the building to host multiple major conventions at the same time, with the goal of being, “the single best destination to host national conventions and even some international conventions.”

Wilson added, “The new Salt Palace will also be a central hub for the 2034 Olympic and Paralympic Winter Games, serving as an operations, hospitality, and event center for the Games.”

A rendering of the new downtown entertainment district paseo. Image via Smith Entertainment District

Abravenel Hall will also receive renovations, as Wilson said the building will get updates to its back of house to improve the experience for musicians and patrons. She added the district will also get a new art museum. Construction on the district is expected to be finished before the 2034 Olympics, though the speakers in the video did not say when construction could begin. 

Wednesday’s announcement includes the most specific plans for the entertainment district to date, as renderings and plans for the area until now have been high-level and conceptual. SEG executive Mike Maughan shared his thoughts in August on approaching the overhaul, but avoided specifics. 

While the new details released are the most specific to date, some aspects of the district aren’t clear from the video released Wednesday. Residential unit counts, office square footage and building heights aren’t specified in the details released this week. 

One rendering depicts a 13-floor residential building on the northeast corner of the block. A hotel is depicted at the northwest corner of the block just to the east of the Delta Center, though it’s not clear exactly how tall that building could be. 

Another aspect that’s unclear is work on 200 West, which is currently buried under the Salt Palace and is depicted in renderings as brought back to at-grade. It’s also not clear what kind of work could be done to 300 West, as a site plan appears to show space for ramps on the street, which presumably would be for added parking. 

All parcels included in the entertainment district are zoned as Downtown Secondary Central Business District (D-4), which carries a 600 foot cap on building height. Any buildings taller than 200 feet must go through a design review with Salt Lake City, and it’s not clear how tall the buildings could be within the district.

Email Jacob Scholl 

A site plan of the new downtown entertainment district. Image via Smith Entertainment District

A rendering of the new downtown entertainment district. Image via Smith Entertainment District

A rendering of a ballroom inside the rebuilt Salt Palace Convention Center. Image via Smith Entertainment District

Share this:

Related Stories

Building Salt Lake Sponsors

1 Comment

Submit a Comment

Get Building Salt Lake in your inbox

* indicates required